Secured to concrete, metal deck, or structural framing, IsoGrid Quick-Connect Ceiling Hanger incorporates a neoprene element which resiliently supports one or more layers of gypsum board.

Resources


Drawings | BIM


BIM OBJECT

ZIP

Perimeter Condition

PDF

DWG



Testing Results


Sound Test- Lab #AT001084

6" Concrete Slab

  • KINETICS NOISE CONTROL PRODUCTS:
    • IsoGrid
  • ACOUSTICAL RATINGS:
    • STC 63
    • IIC 50
  • TESTING AGENCY & REPORT NUMBER:
    • NRC-CNRC
    • B-3463.6


Submittal Documents


Click on image to enlarge. Download multiple files by checking orange boxes next to desired files then click EXPORT.

Testing


STC/IIC Sound Test Data

  • Sound Test- Lab #AT001084
  • 6" Concrete Slab
  • Model IsoGrid
  • 6" Airspace Filled with R19 Fiberglass Batt
  • Wire Ties
  • Cold Rolled Channel
  • Furring Channel
  • 5/8" Type 'X' Gyp. Board
  • 5/8" Type 'X' Gyp. Board

System Components


RESILIENT INTERFACE (CPT)

SEALANT


Drawings


Submittal Drawing -top bracket fits into Unistrut®

Perimeter/Penetration Detail


Additional Documents


DATA SHEET

SPECIFICATIONS

LEED

WARRANTY

INSTALLATION GUIDELINES



Installation


Installation Overview


DOWNLOAD

CHALKLINES

Following installation guidelines, mark hanger locations.

  • RESILIENT INTERFACE

    Adhere Ceiling Perimeter Tape (CPT by KNC) to all perimeters and penetrations.* CPT prevents sound vibration from transferring from the isolated slab to the non-isolated structure.

  • ATTACH HANGERS TO DECK

    Install hangers at grid intersections.

  • CLOSE HANGER LEGS AND TIE WIRE

  • COLD ROLLED CHANNEL AND DRYWALL FURRING CHANNEL

    Following normal industry spacing and standards, screw drywall furring into CRC.

  • GYPSUM BOARD

    Attach gypsum board to drywall furring channel using normal means and methods.

  • ACOUSTIC SEALANT

    If desired or per project specifications, add acoustics sealant (by KNC) at all CPT areas.


Installation Guidelines


DOWNLOAD

  • Preparation
    • 1. Installation of an isolated ceiling system that uses Kinetics Noise Control IsoGrid ceiling hangers requires the following materials (as specified by others and purchased separately):
      • A. 1-1/2" x 1/2", 16-gauge cold-rolled channel
      • B. 7/8" 20- to 25-gauge drywall furring channel
      • C. Appropriate wire (per local code)
      • D. Anchors for mounting wire into non-isolated ceiling substrate
      • E. 1/2" or 5/8" thick gypsum board
      • F. Appropriate tools and equipment for installation

Please note: If shop drawings have been prepared for the installation, review drawings for completeness and accuracy.

  • Installation
    • 2. Mark grid pattern and ceiling hanger position on existing non-isolated ceiling using the following criteria:
      • A. Isolators installed at the perimeter must be located not more than 12" and not less than 3” from the edge of the isolated ceiling.
      • B. Isolators may be located up to 48" along the perimeter of the isolated ceiling.
      • C. Isolators mounted mid-room (i.e., those isolators not at the perimeter) may be located up to 48" on center each way (o.c.e.w.); mid-room isolators should be spaced evenly in each direction.

Please note: Shop drawings, if provided, override general location guidelines provided above.

    • 3. Remove IsoGrid Ceiling Hangers from box. Confirm capacity of each isolator to ensure proper location in grid by observing the small colored dot on the side of the rubber element (See chart below).
IsoGrid Dot Color Recommended Layers of Drywall Maximum Capacity (lbs.) Deflection Range (in.)
40 White 1 41 0.2
105 Green 2 106 0.2
160 Red 3 150 0.2

If provided, shop drawings will identify location of specific hanger by capacity rating.

    • 4. Determine orientation of cold-roll channel, typically oriented along longest dimension of room (orientation is not important acoustically).
    • 5. Fasten IsoGrid ceiling hanger to a concrete ceiling with a power-actuated fastener such as a Hilti X-DNI general purpose nail with a Hilti R-23 washer or other fastener as allowed by the local building code.

Please note: A Hilti representative can help you select the proper length nail for your specific application by calling 1-800-879-8000.

For example: An IsoGrid 160 fastened to 2000-4000 psi concrete slab would require 1.5" of nail embedment to hold the desired load. Therefore a Hilti X-DNI 82P8 nail would be required.

    • 6. Squeeze legs of the IsoGrid bracket together
    • 7. Tie wire through the holes on both sides of the IsoGrid bracket using appropriate practices for ceiling grid installation.
    • 8. Position the cold-rolled channel at desired height. Prevent contact between cold-rolled channel and partition/wall/column or any other non-isolated structural component. Leave at least a 3/8" gap between cold-rolled channel and the non-isolated structure.
    • 9. Tie free end of wire around cold rolled channel using appropriate practices for ceiling grid installation.
    • 10. Attach drywall furring channel to cold-rolled steel and inter-connect the ends of the furring channel using appropriate practices for ceiling grid installation. Furring channel cannot contact non-isolated structural components. Leave at least a 3/8” gap between cold-rolled channel and the non-isolated structure.
    • 11. After assembling the ceiling grid, check for levelness. Loosen or tighten the wire to adjust the level of the grid.
    • 12. Install CPT ceiling perimeter tape around partitions/walls, columns, and any non-isolated building components to insure a 1/4” wide decoupling gap between the isolated ceiling and the non-isolated structure. CPT should be installed from approximately 7/8” below the bottom of the hat channel to the top of the cold-rolled channel
    • 13. Install the gypsum board using accepted practices for attaching to the grid system. Be certain to maintain a 1/4” gap between non-isolated structural components and the isolated ceiling to ensure that the gypsum board does not contact any non-isolated structural components. Do not allow the CPT to become compressed against the non-isolated structure.
    • 14. Trim CPT as required and caulk gap using a resilient, non-hardening caulk.

Disclaimer
These suggested installation guidelines represent generally accepted procedures for successful installation of Kinetics Noise Control IsoGrid Quick Connect Ceiling Hanger for ceiling system isolation. These suggestions may be followed, modified, or rejected by the owner, engineer, contractor, and/or their respective representative(s) since they, not Kinetics Noise Control, are responsible for planning and executing procedures appropriate to a specific application. Kinetics Noise Control reserves the right to alter these suggestions and encourages contact with the factory or its representatives to review any possible modification to these suggested guidelines prior to commencing installation.


Fast attachment can be made directly to the concrete by using powder-actuated fasteners (where loads and local code permit). Wire is then tied to the bottom of the hanger bracket through the built-in mounting holes. Gypsum board is installed using either drywall ceiling grid or cold rolled and drywall furring channel.

Greater deflection translates to greater performance for your noise control ceilings. The IsoGrid Quick Connect Ceiling Hanger utilizes a specially designed dual deflection neoprene isolator which allows internal bulging. These internal bulge areas enables the neoprene element to achieve greater deflections than similarly sized elements while maintaining lateral stability.

  • Meet STC and IIC noise requirements while maximizing ceiling height
  • Easiest and quickest install of any isolated ceiling hanger
  • Known deflection rates ensure acoustical performance under design loads
  • Only one wire tie point equals labor savings over conventional sound control ceiling hangers